Real Results.
Project-Specific Reported Results.
Explore selected published examples from a range of industries. Each study includes its source, reporting period, and measurement details. These examples are not the complete collection.
How to read these results
“Source” identifies the underlying record—such as utility bills, an AWS measurement report, or a technical document. “Measure” identifies what that source compared. Dollar savings reflect billed cost. Metered volume reflects the utility meter record. Daily-use comparisons adjust totals for the number of days measured, while occupancy-normalized comparisons also account for occupancy. These measures are not interchangeable, and each project uses its stated source period and method. Start with a relevant example such as the Amazon fulfillment-centre case study, then follow its source and method notes. Use the commercial water bill guide to identify which charges and comparison inputs matter for a site review. For engineering and controlled lab evidence, see the testing and validation page.
Amazon YYZ3 & YYZ4 Fulfillment Centres
Smart Valve™ installed June 2024 · AWS-supplied Q3/Q4 2024 year-over-year analysis · Formal PDF available
Quarterly datasets shown separately below; Q4 includes the documented removal/reinstallation interval
- Year-over-year quarterly comparison vs Q3/Q4 2023 baseline
- 43.98% = YYZ3 Q3/Q4 2024 average · 29.27% = YYZ3 Q4 2024
- YYZ4: valve removed Sept 5 and reinstalled Oct 25; the separate Q3/Q4 dataset is shown without assigning a sole cause to the Q4 change
- YYZ4 Q3: 17.36% reduction · YYZ4 Q4: 14.44% usage increase
- Both YYZ3 and YYZ4 formal PDF reports available on request
YYZ3: 1,107m³ → 457m³ (verified Q3 2024 comparison) · YYZ4: 3,933m³ → 3,250m³ (17.4% reduction) · Source: Amazon Case Study PDF
Four Seasons Fort Lauderdale
AWS pilot report dated December 12, 2025 · Individual results vary
AWS-reported Dec 12, 2025 pilot · 26% daily use and 34% occupancy-normalized reduction on the 6-inch service; 17% combined-system occupancy-normalized reduction
- 26% reduction in daily water use (6-inch service)
- 34% reduction in occupancy-normalized use (6-inch service); 17% reduction in combined system occupancy-normalized use
- ~$27,000 annual avoided cost at current tariffs
- Installation planning and timing were managed for this project; requirements vary by site.
Caliber Car Wash (5-Site Portfolio)
Bill-level utility review · prior-year baselines · varying comparable periods · Georgia & Florida
20% average overall daily-water-use reduction · 23% weighted matched-calendar-month savings
- 20% average overall daily-water-use reduction
- 23% weighted matched-calendar-month savings
- at least four post-install billing periods per site; comparable periods varied by site
- variable water/sewer charges with fixed charges excluded
- Results vary by site. Benbrooke's missing branch was excluded, and Flagler Beach was normalized per wash because wash volume increased.
Grand Central at Kennedy
Self-reported over 2-year period · Two 6″ Smart Valve™ units · Confirmed by General Manager
Source-stated annual line item: $240,000 before → $190,000 after; approximately $50,000/year reported savings
- $50,000 annual reduction in the combined water and sewer line item
- Source statement reports a 23% average reduction over a customer-confirmed 2-year period
- Two 6″ Smart Valve™ units — one per master meter supply line
Wheatland Terrace — Dallas, TX
Smart Valve™ installations: Jan–Feb 2026 · Verified reporting period: Jan–Apr 2026 · 6 installations
Source: American Water Savings · Wheatland Terrace water utility billing, Jul 2024–Apr 2026
Two independent methods agree within 3 percentage points · Green dashed = 15% guarantee
- 31% Pre/Post Average and 34% Month-to-Month — two independent methods within 3 percentage points
- 2.1× the 15% guarantee (conservative method) · 2.3× on month-to-month
- Daily consumption dropped from 122.2 to 84.5 units/day (volume-weighted across all 6 sites)
- 8114 and 8132 Leigh Ann Dr each achieved 46% savings — strongest results in the portfolio
- Every matched month-pair beat the 15% guarantee threshold
Willowood Portfolio D LLC
Installed Dec 26, 2025 · 4 meters at 5616 Spring Valley Road · Early M&V: prior-year baseline vs. first two post-install months
Source: American Water Savings · Early M&V Client Summary
$2,559.24 monthly savings against $541.18 monthly program cost · 473% ROI
- 18% reduction in aggregated average daily usage across all 4 meters
- 7,200 gallons per day saved in aggregate across four installed meters
- Monthly savings of $2,559.24 against a $541.18 monthly program cost — 473% ROI
- Early M&V only — full 12-month verification is ongoing
RWJ Barnabas Ambulatory Care
Installed December 2016 · Confirmed by Facility Engineer J. Flanagan · Two 2″ Smart Valve™ units
From $72,700 → $57,200 per year · 1,533,000 gallons saved annually
- Annual cost reduced from $72,700 to $57,200 — saving $15,500/yr
- 1,533,000 gallons saved per year — confirmed by facility engineer
- Source report includes a facility-equipment pressure/flow statement; this is not clinical or medical approval
- Simple payback under 6 months from day of installation
Source before-period figure: 19,625 gal/day · source after-period figure: 15,425 gal/day · reported reduction: 19%
Verified M&V Results
Selected published project results · Measurements and periods differ
Also Installed (No Stats Published)
Full Case Study Pages — All Charts & Data
American Water Savings Source Library
Explore selected source-linked project records and technical evidence from American Water Savings. Project records describe reported site outcomes; technical documentation supports a different purpose and is not a customer savings study. Each entry links to its source and the related Perfect Water Valve analysis.
NYC DOB OTCR Report
New York City Department of Buildings
Official material acceptance report confirming functionality and safety via Texas A&M Engineering testing.
Ten-Story Office Building
Houston, TX
180,000 SF multi-tenant office on a 4-inch main meter achieved significant year-over-year savings.
Nine-Story Office Building
North Houston, TX
156,000 SF multi-tenant office reduced average daily usage by 38% after 6-inch valve installation.
RWJ Barnabas Health
New Jersey
Multi-purpose medical ambulatory care center reduced water consumption with a payback under 6 months.
Oasis Car Wash
Angola, IN
High-volume car wash achieved consistent cost-per-car reductions validated by municipal utility bills.
Park Avenue Apartments
5100 Park Avenue, West New York, NJ
48-unit mixed-use apartment building delivered a 7-month ROI via direct meter efficiency.
Courtyard Apartments
Hackensack, NJ
80-unit mid-rise apartment achieved significant verified usage drops.
Chateau Tower Condominiums
Tampa, FL
HOA property reduced bulk water and sewer line items, verified by property management.
1625 Palisades Avenue
Union City, NJ
38-unit, 5-story apartment building saved 343,000 gallons annually on a 2-inch meter.
Park Gardens
East Orange, NJ
48-unit apartment complex demonstrated robust metered consumption improvements.
500 Main Street
Orange, NJ
16-unit apartment recorded highly consistent post-install savings.
Jefferson Arms
Orange, NJ
28-unit apartment building generated a 15-month payback on a 1.5-inch meter.
451 Central Ave
Orange, NJ
13-unit apartment building generated measurable cost drops on a standard municipal feed.
Evidence types vary. Project records may use utility bills or AWS-reported M&V. Technical documentation is presented separately and does not report customer savings. Individual results vary, and each entry links to its exact American Water Savings source. Any 15% minimum applies only to qualifying projects under a written performance agreement.
Results use different evidence, reporting periods, and measurement methods. Individual outcomes vary by project. Source-linked records include: Amazon (YYZ3/YYZ4), St. Regis Toronto, Four Seasons Fort Lauderdale, RWJ Barnabas Health, Toronto Multi-Residential Portfolio, and Park Avenue Apartments (West New York, NJ). Caliber Car Wash is summarized from a five-site bill-level utility review. Houstonian Estates and Grand Central at Kennedy results are self-reported customer testimonials confirmed by property management. Wheatland Terrace and Willowood Portfolio results are sourced from American Water Savings M&V reports; Willowood is early M&V covering only the first two post-install months. This page presents selected published projects and is not a complete collection.
Ready to see your numbers?
Get a site-specific proposal with projected savings and payback period.
