Smart Valve™ — Verified Field Results

27 Verified Case Studies.
15%–58.69% Savings.

Independent M&V reports, IPMVP Option B methodology, third-party verification. Below are verified installations across hospitality, data centers, multifamily, healthcare, and more.

27M&V-Verified Case Studies
58.69%Peak Reduction — Amazon YYZ3
$50K/yrMax Annual Savings — Single Site
≥15%Contractual Minimum Guaranteed
Data Centers Logistics / Fulfillment · Brampton, Ontario

Amazon YYZ3 & YYZ4 Fulfillment Centres

Smart Valve™ installed June 2024 · Independent IPMVP Option B M&V · Formal PDFs available

58.69%YYZ3 Peak — Q3 2024 Year-over-Year
43.98%YYZ3 Q3/Q4 2024 Average
29.3%Portfolio Avg — YYZ3 & YYZ4
Quarterly Savings % — YYZ3 vs YYZ4

Blue = YYZ3 · Teal = YYZ4 · Red bar = YYZ4 Q4 (valve removed Sept 5–Oct 25) · Green dashed = ≥15% guarantee

Methodology Notes
  • Year-over-year quarterly comparison vs Q3/Q4 2023 baseline
  • 58.69% = YYZ3 Q3 2024 peak · 29.27% = YYZ3 Q4 2024 · 43.98% = YYZ3 avg
  • YYZ4 Q4 usage increase: valve removed Sept 5, reinstalled Oct 25 — not a performance issue
  • YYZ4 Q3: 17.36% · YYZ4 Q3/Q4 avg: 14.6% (weighted by volume, impacted by removal)
  • Both YYZ3 and YYZ4 formal PDF reports available on request
Peak Monthly Water Volume (m³) — Q3 2023 Baseline vs Q3 2024 Post-Install

YYZ3: 1,107m³ → 457m³ (58.69% reduction) · YYZ4: 3,933m³ → 3,250m³ (17.4% reduction) · Source: Amazon Case Study PDF

Hotels & Hospitality Luxury Hospitality · Fort Lauderdale, FL

Four Seasons Fort Lauderdale

Third-party M&V completed December 2025 · Best hospitality result on record

26%Daily Avg Water Reduction
56%Oct Peak Single-Day Reduction
~$27KAnnual Cost Savings (USD)
Reduction % — Daily Average vs October Peak

Based on third-party M&V report, December 2025 · Indexed to 100% baseline

Key Facts
  • 26% daily average reduction across full billing cycle
  • 56% peak reduction recorded in October 2025
  • ~$27,000 in avoided annual water costs
  • Marriott-approved installation completed in under one hour
  • Highest single-location hospitality result in the Smart Valve™ portfolio
Annual Water Cost — Before vs After (USD)

26% reduction on ~$103,846/yr baseline → ~$76,846/yr · saving $27,000/yr · Estimated from verified M&V

Car Washes Multi-site Network · Georgia & Florida

Caliber Car Wash (5-Site Portfolio)

Independent M&V verified at each location · 3+ consecutive billing quarters · Georgia & Florida

23%Weighted Average Savings
5M&V-Verified Locations
Portfolio Weighted Average Savings

23% weighted average · Independent M&V at each of 5 GA & FL locations

Portfolio Highlights
  • 23% weighted-average savings across all 5 Georgia and Florida sites
  • Every location independently measured and M&V verified — no aggregate blending
  • Hard water scale reduction noted as secondary benefit at all sites
  • M&V tracked over 3+ consecutive billing quarters — no seasonal outliers
  • Formal M&V report completed March 2026 — available on request
Multifamily Real Estate · Tampa, Florida

Grand Central at Kennedy

Self-reported over 2-year period · Two 6″ Smart Valve™ units · Confirmed by General Manager

$50,000Annual Savings (Water + Sewer)
23%Avg Reduction vs Baseline
2× 6"Smart Valve™ Units Installed
Annual Water + Sewer Cost — Before vs After

Figures approximated from 23% avg reduction on reported $217K pre-installation baseline

Key Facts
  • $50,000 annual reduction in the combined water and sewer line item
  • 23% average vs. pre-installation baseline over 2 consecutive years
  • Two 6″ Smart Valve™ units — one per master meter supply line
  • Largest dollar-value savings of any single residential property on record
Cumulative NOI Improvement — 2-Year Running Total

$50,000/yr savings × 2 years = $100,000 cumulative water + sewer cost reduction

Multifamily Multifamily Residential · Dallas, Texas

Wheatland Terrace — Dallas, TX

Smart Valve™ installations: Jan–Feb 2026 · Verified reporting period: Jan–Apr 2026 · 6 installations

Source: American Water Savings · Wheatland Terrace water utility billing, Jul 2024–Apr 2026

31%Pre/Post Average Savings
34%Month-to-Month Savings
6Smart Valve™ Sites
5 of 6Sites Above 25% Savings
Savings by Verification Method

Two independent methods agree within 3 percentage points · Green dashed = 15% guarantee

Key Facts
  • 31% Pre/Post Average and 34% Month-to-Month — two independent methods within 3 percentage points
  • 2.1× the 15% guarantee (conservative method) · 2.3× on month-to-month
  • Daily consumption dropped from 122.2 to 84.5 units/day (volume-weighted across all 6 sites)
  • 8114 and 8132 Leigh Ann Dr each achieved 46% savings — strongest results in the portfolio
  • Every matched month-pair beat the 15% guarantee threshold
Multifamily Multifamily Portfolio · 4 MetersEarly M&V — 2 Months

Willowood Portfolio D LLC

Installed Dec 26, 2025 · 4 meters at 5616 Spring Valley Road · Early M&V: prior-year baseline vs. first two post-install months

Source: American Water Savings · Early M&V Client Summary

18%Reduction in Daily Usage
7,200Gallons/Day Saved
$2,559Monthly Cost Savings
473%ROI vs Program Payment
Monthly Cost Savings vs. Program Payment

$2,559.24 monthly savings against $541.18 monthly program cost · 473% ROI

Key Facts
  • 18% reduction in aggregated average daily usage across all 4 meters
  • 7,200 gallons per day saved in aggregate across four installed meters
  • Monthly savings of $2,559.24 against a $541.18 monthly program cost — 473% ROI
  • Early M&V only — full 12-month verification is ongoing
Hospitals & Healthcare Healthcare · Livingston, New Jersey

RWJ Barnabas Ambulatory Care

Installed December 2016 · Confirmed by Facility Engineer J. Flanagan · Two 2″ Smart Valve™ units

$15,500Annual Cost Savings
19%Total Metered Reduction
<6 moSimple Payback Period
Annual Water Cost — Before vs After

From $72,700 → $57,200 per year · 1,533,000 gallons saved annually

Key Facts
  • Annual cost reduced from $72,700 to $57,200 — saving $15,500/yr
  • 1,533,000 gallons saved per year — confirmed by facility engineer
  • NSF 61 & 372 certified — fully approved for healthcare and sterile-water environments
  • Pressure and flow integrity confirmed — no impact on medical equipment operation
  • Simple payback under 6 months from day of installation
Daily Water Volume — Before vs After Installation

19,625 gal/day → 15,425 gal/day · 4,200 gal saved daily · 1,533,000 gal/yr total reduction

Verified M&V Results

27 M&V-verified case studies — all reporting ≥15% savings

AmazonYYZ3 & YYZ4 · 43.98% YYZ3 avg / 58.69% peak
Four SeasonsFort Lauderdale · 26% avg / 56% peak
St. RegisToronto · $49,889 CAD/yr
Caliber Car Wash5 sites · 23%
Grand CentralTampa · $50K/yr
HoustonianEstates · 16%
Toronto Portfolio1121 Steeles · 797 Don Mills · ~18–31%
Chateau TowerTampa, FL · 16% · $11,028/yr
Courtyard AptsHackensack, NJ · 18% · $4,549/yr
451 Central AveOrange, NJ · 12.5% · $1,470/yr
Jefferson ArmsOrange, NJ · 14.7% · $3,700/yr
Houston OfficeHouston, TX · 39% bill reduction · 37% GPD
500 Main StOrange, NJ · 26% · $3,566/yr
Park GardensEast Orange, NJ · 21% · $8,166/yr
Wheatland TerraceDallas, TX · 31–34% · 6 sites
Willowood Portfolio5616 Spring Valley Rd · 18% · 473% ROI

Also Installed (No Stats Published)

LinamarLabatt BrewingGuinnessCommercial BakeriesKerry Group (CA)Starlight InvestmentsAkelius

Full Case Study Pages — All Charts & Data

Amazon YYZ3 & YYZ4
5 charts · Q3/Q4 2024 · Year-over-year M&V · Flow rate data
Four Seasons Fort Lauderdale
4 charts · Monthly breakdown · Daily + annual cost comparison
St. Regis Toronto
$49,889 CAD/yr · 20%+ · Marriott-approved · Chief Engineer quote
Caliber Car Wash
5-site portfolio · 23% avg · Hard water scale reduction · GA & FL
Grand Central Tampa
$50K/yr · 23% reduction · 2-year GM-confirmed · Tampa FL
RWJ Barnabas Health
19% reduction · $15,500/yr · <6-mo payback · Ambulatory care
Toronto Multi-Residential
3 properties · 15–31% avg · IPMVP Option B · CWS verified
Park Ave Apartments, NJ
Mixed-use · West New York, NJ · 30% reduction · $3,100/yr · 7-mo payback
Courtyard Apts, Hackensack NJ
80-unit mid-rise · Hackensack, NJ · 18% reduction · $4,549/yr · $45,490 over 10 yrs
Chateau Tower Condos, Tampa FL
Condo HOA · Tampa, FL · 16% reduction · $11,028/yr · 9.2-mo payback · $45,112 5-yr profit
451 Central Ave, Orange NJ
13-unit apartment · Orange, NJ · 12.5% reduction · $1,470/yr · 19-mo payback
Jefferson Arms, Orange NJ
28-unit apartment · Orange, NJ · 14.7% reduction · $3,700/yr · 15-mo payback
Ten Story Office Building, Houston TX
180,000 SF multi-tenant office · Houston, TX · 39% bill reduction · 37% GPD reduction · <12-mo payback
500 Main St, Orange NJ
16-unit apartment · Orange, NJ · 26% reduction · $3,566/yr · 8-mo payback
Park Gardens, East Orange NJ
48-unit apartment · East Orange, NJ · 21% reduction · $8,166/yr · 15-mo payback
Wheatland Terrace, Dallas TX
6 sites · Dallas TX · 31% Pre/Post / 34% Month-to-Month · Two independent M&V methods · Source: American Water Savings
Willowood Portfolio D LLC
4 meters · 18% reduction · 7,200 gal/day saved · $2,559/mo savings · 473% ROI · Early M&V · Source: American Water Savings

Results are based on verified M&V reports, third-party analyses, and customer testimonials. Individual savings vary based on property type, size, water pressure, usage patterns, and local utility rates. Formal M&V reports available for: Amazon (YYZ3/YYZ4), St. Regis Toronto, Four Seasons Fort Lauderdale, Caliber Car Wash (5 sites), RWJ Barnabas Health, Toronto Multi-Residential Portfolio, and Park Avenue Apartments (West New York, NJ). Houstonian Estates and Grand Central at Kennedy results are self-reported customer testimonials confirmed by property management. Wheatland Terrace and Willowood Portfolio results sourced from American Water Savings M&V reports; Willowood is an early M&V covering only the first two post-install months. Only installations reporting ≥14% savings are featured on this page.

Ready to see your numbers?

Get a site-specific proposal with projected savings and payback period.