Multifamily PortfolioEarly M&V — 2 Months Post-Install5616 Spring Valley Road · Dallas, TX (est.) · 4 Meters

Willowood Portfolio D LLC

Installed Dec 26, 2025 · 4 meters · Dallas, TX (est.) · Early M&V comparison: prior-year baseline vs. first two post-install months

Source: American Water Savings · Early M&V Client Summary

18%Reduction in Avg Daily Usage
7,200Gallons/Day Saved (Aggregate)
$2,559Monthly Cost Savings
473%ROI vs Program Payment
Early M&V Report — Preliminary Results

This report covers only the first two months after installation (Dec 26, 2025). The methodology compares the prior year's pre-install average daily usage against the first two post-install months. Full 12-month M&V verification is ongoing. Early results are promising but should be interpreted as preliminary.

Early Performance Data

Monthly Cost Savings vs. Program Payment

$2,559.24 monthly savings against $541.18 monthly program cost · 473% ROI · Source: American Water Savings

Relative Daily Usage — Pre vs Post Install (Indexed to 100)

18% reduction across 4 meters · Prior-year pre-install average vs first 2 post-install months

Key Facts

Performance
  • 18% reduction in aggregated average daily usage across all 4 meters
  • 7.2 thousand gallons per day saved in aggregate across four installed meters
  • $2,559.24 in monthly cost savings at current water rates
  • 473% ROI — monthly savings are 4.7× the $541.18 monthly program payment
  • Installation completed December 26, 2025 across four meters
Methodology
  • Prior-year pre-install average daily usage compared against the first two post-install months
  • Results shown in aggregate across all four installed meters
  • Early M&V review — full 12-month verification period is ongoing
  • Report prepared by American Water Savings for customer review

Source: American Water Savings · Early M&V Client Summary prepared for Willowood Portfolio D LLC. Installation date: December 26, 2025 · 4 meters at 5616 Spring Valley Road. This is an early M&V review covering only the first two post-install months; results compare prior-year pre-install average daily usage against the first two post-install months shown in aggregate across all four meters. Full 12-month M&V verification is in progress. Individual results vary based on property type, size, water pressure, usage patterns, and local utility rates.