Hospital Water Operations

Hospital Water Operations and Site Assessment

AWS reviews metered water and sewer charges, meter configuration, site access, and operating constraints. Smart Valve™ is installed after the meter; the facility confirms any planned shutdown and operating requirements.

Billing review

Review eligible water and sewer charges, billing periods, and available baseline information.

Meter and site review

Confirm meter location, proposed device location, access, and downstream operating needs.

Installation planning

The site confirms a planned installation shutdown. Later external adjustments do not require a shutdown.

Materials scope

NSF 61 and NSF 372 materials information can be provided for the facility team’s review; the facility confirms suitability.

Request a hospital site assessment

Share your billing and site questions. AWS will confirm scope, costs, and operating requirements before any proposal.

$

Qualifying commercial sites typically have about $5,000 or more per month in combined water and sewer charges. Your assessment confirms site fit and whether a written guarantee applies.

Privacy Policy | Terms and Conditions