Billing review
Review eligible water and sewer charges, billing periods, and available baseline information.
Hospital Water Operations
AWS reviews metered water and sewer charges, meter configuration, site access, and operating constraints. Smart Valve™ is installed after the meter; the facility confirms any planned shutdown and operating requirements.
Review eligible water and sewer charges, billing periods, and available baseline information.
Confirm meter location, proposed device location, access, and downstream operating needs.
The site confirms a planned installation shutdown. Later external adjustments do not require a shutdown.
NSF 61 and NSF 372 materials information can be provided for the facility team’s review; the facility confirms suitability.
Share your billing and site questions. AWS will confirm scope, costs, and operating requirements before any proposal.